Generate a CMR report

A CMR report can be generated for a shipment in the status LOADED, LOADING, PAUSED, STOPPED and COMPLETED.

Normally, a CMR report is automatically printed when closing a shipment. If this has not happened for some reason (e.g. no paper available in the printer), a CMR report can still be generated via this procedure.

  1. Choose Outbound Management > Shipments in the Navigation Pane.
  2. Select the completed shipment.
  3. Do one of the following:
    • Click in the toolbar, and select CMR Report in the drop-down menu.
    • Right-click the selection and choose CMR Report in the shortcut menu.
  4. Choose the desired language from the Report Language drop-down list.
  5. Click Finish.