Jump to main content
Objective logo
Objective user manual 7.x
  • Preface
  • Introduction
  • Applications
  • General
  • MES
  • WMS
  • WFM
Index
  1. Home
  2. MES
  3. Planning Management
  4. Planning
  5. Supervision
  6. Status change via Gantt diagram
  • MES
    • Production Management Engine
    • Process & Quality Management
    • Material Management
    • Advanced Equipment Management
    • Operator Activity Management
    • Advanced Data Collection
    • OEE
    • Planning Management
      • Planning Cells
      • Relations between operations
      • Planning Board
      • Planning
        • Supervision
          • Move an operation
          • Edit the days of a resource
          • Edit the shifts of a resource
          • Refresh the planning
          • Update the planning with the estimated durations of the operations
          • Actualize the planning
          • Advance the planning
          • Status change via Gantt diagram
            • Plan a production order (via Gantt diagram)
            • Plan an operation (via Gantt diagram)
            • Release the planning (via Gantt diagram)
            • Unplan the operation (via Gantt diagram)
            • Allocate an operation (via Gantt diagram)
            • Deallocate an operation (via Gantt diagram)
            • Release an operation (via Gantt diagram)
            • Unrelease an operation (via Gantt diagram)
          • Unavailabilities
          • Downtimes
          • Edit operations
          • Skills and capacities
          • Include actual information (via Gantt diagram)
      • Production Calendars
      • Multi Level BOM
    • Advanced Planning
    • ISA88 Batch Management
    • One Piece Flow Line Balancing
    • Subcontracting
    • Product Tracking & Genealogy (MES)

Status change via Gantt diagram

  • Plan a production order (via Gantt diagram)
  • Plan an operation (via Gantt diagram)
  • Release the planning (via Gantt diagram)
  • Unplan the operation (via Gantt diagram)
  • Allocate an operation (via Gantt diagram)
  • Deallocate an operation (via Gantt diagram)
  • Release an operation (via Gantt diagram)
  • Unrelease an operation (via Gantt diagram)
  • Plan a production order (via Gantt diagram)
  • Plan an operation (via Gantt diagram)
  • Release the planning (via Gantt diagram)
  • Unplan the operation (via Gantt diagram)
  • Allocate an operation (via Gantt diagram)
  • Deallocate an operation (via Gantt diagram)
  • Release an operation (via Gantt diagram)
  • Unrelease an operation (via Gantt diagram)