Condition: Operations with the status IDLE or STOPPED can be planned.
-
Choose in the Navigation Pane.
-
Select the planning cell.
-
Choose the tab Planning.
-
In the planning board, right-click where you want to plan the operation.
 | Click the intersection between the chosen resource (line) and the chosen time (column)! |
-
Choose Operation Planning in the shortcut menu.
-
Select the operations that can be planned.
-
Click Finish.
The operation is planned at the place where you right-clicked.