Seal operations
When sealing operations, the planned stop of one operation becomes the planned start of the following operation.
This action cannot be carried out on a work center with a parallel planning mode.
![]() | When sealing operations that have a relation between them, the set minimum delay between the operations will be taken into consideration. |
