Group a selection of operations
To have similar consecutive operations on a resource, (already planned) operations that are similar in nature (A, C and D) can be selected and grouped. All these operations are planned after the first selected operation (A). Any operations (B) lying in between the grouped operations will be moved in the planning afterwards.
For a resource with a parallel planning mode:
If a parallel planning mode was set, the grouped jobs will be distributed over the different capacities in the most optimal way with the 'Planned Start' of the job as start date. If insufficient capacity is available, the job will be moved to the first available time slot. Any operations (B) lying in between the grouped operations will be moved in the planning afterwards.