Create a new repack configuration

Which repackaging operation will be executed and from which work zone picking will take place is set in a repackaging configuration.

The most specific configuration takes precedence over a more general configuration.

For example:

Repack Configuration Work Zone Repack Operation
Repack01 All Repack with foil
Repack01 200 Repack to EUR pallets

All stock is repackaged with foil, except for stock from work zone 200, which is repackaged for EUR pallets.

  1. Choose VAL, Kit & Repack Management > Repack Operations in the Navigation Pane.
  2. Choose the tab Repack Configurations.
  3. Click New Repack Configuration .
  4. In the option group Settings, complete the fields below:
    FieldExplanation

    Repack ID

    (mandatory field)

    The name of the repack operation.

    Repack Operation

    (mandatory field)

    The repack operation that will be executed.

    Do one of the following:

    • Enter the name of the operation.
    • Click Select Repack Operation (or press Alt + V), select a repack operation and click Finish.
  5. In the option group Work Zone, select one of the following options:
    OptionExplanation
    Any Work Zone Picking can take place from all the work zones in order to perform the repackaging.
    Work Zone

    Provide the work zone from which picking can take place in order to perform the repackaging.

    Do one of the following:

    • Enter the name of the work zone.
    • Click Select Work Zone (or press Alt + W), select a work zone and click Finish.
    A work zone can be added to multiple repackaging configurations.
  6. Click Finish.