Configure a repack operation
To execute repack, items must be picked. The items can also be picked from the WIP-OUT location of a work center after a Kit and/or VAL operation. The WIP-OUT location must belong to the work zone that is used to pick the items for the repack configuration.
The order is always: Picking > Kit > VAL > Repack > Shipping.
