Make to Stock

Items can be composed for storage in the warehouse.
Figure: Production flow Kit-to-stock operation

For example: Kittings are made for stock. The items are picked (1) and moved to the WIP-IN Location (2) of the KIT work center (3). At the KIT work center (3) the operator executes the instructions (4) relevant to the Kit operation. The kittings are moved to the WIP-OUT Location (5) of the KIT work center (3). The kittings are relocated back to the warehouse (7).

Figure: Kitting - KIT-to-stock