Add Output Production

This task allows users to add extra production output for LPN and bulk items used in the production process.
  • Users can add output production only for inventories that are part of the Bill of Material (BOM).
  • This functionality applies to operation cycles that are complete but the order is still active. Users can add output production for active operation cycles via the Operator client.
  1. Select the job for which you want to Add Output.
  2. Choose the tab WIP Out.
  3. At the bottom of the tab, choose Details.
  4. Select the Output line that requires correction in the production.
  5. Click Add Output in the toolbar.
    The dialog box Wizard Add Output will appear with different option groups based on the configuration of WIP-Out Inventory at output registration in a recipe. The option can be: