Restore a day (via planning)
A day cannot be restored if the day has already been approved. |
- Choose Navigation Pane. in the
- Select the planning cell.
- Choose the tab Planning in the Data Pane.
- Use a time filter to select the desired period.
- Select one or more availabilities in the availability pane.
- Right-click the selection and choose Restore Day in the shortcut menu.
- Confirm in the dialog box Restore Day.