Jump to main content
Objective logo
Objective user manual 7.x
  • Preface
  • Introduction
  • Applications
  • General
  • MES
  • WMS
  • WFM
Index
  1. Home
  2. MES
  3. Production Management Engine
  4. Production Calendars
  5. Configuration
  • MES
    • Production Management Engine
      • Employees in MES
      • Items in MES
      • Devices in MES
      • Departments in MES
      • Production Calendars
        • Configuration
          • Add a production resource to a calendar
          • Apply a calendar to a production resource
        • Supervision
      • Machines and Work Centers
      • Data collection
      • Interrupts
      • Alarms
      • Recipes
      • Production Orders
      • Maintenance
      • Non-conformities
    • Process & Quality Management
    • Material Management
    • Advanced Equipment Management
    • Operator Activity Management
    • Advanced Data Collection
    • OEE
    • Planning Management
    • Advanced Planning
    • ISA88 Batch Management
    • One Piece Flow Line Balancing
    • Subcontracting
    • Product Tracking & Genealogy (MES)

Configuration

For the basic configuration of calendars, see Configuration.

In the module Production Management Engine, production resources can be added to a calendar, and subsequently the calendar can be applied to the resource. Once the calendar has been applied to the resource, planning can take place.

  • Add a production resource to a calendar
  • Apply a calendar to a production resource
Ⓒ Objective BVBA