Select an interrupt on a job

  1. Choose Production Management in the Navigation Pane.
  2. Do one of the following:
    • Choose a department, machine, work center, resource group or planning cell.
    • Choose My 'Element'.
    • Choose a filter.
  3. Choose the tab 'Element' Analysis > Jobs (for example Department Analysis > Jobs).
  4. Use a time filter to enter the desired period.
  5. Select one or more jobs.
  6. Click the sub tab Interrupts.
  7. Select the interrupt.