Copy and optimize an offline planning

The copied planning can be optimized immediately.
  1. Choose Production Management > Planning Cells in the Navigation Pane.
  2. Select the planning cell.
  3. Choose the tab Planning.
  4. Click Edit Planning .
  5. Click Copy & Optimize Planning .
  6. Make adjustments as required in the dialog box Copy & Optimize Planning Wizard, and click Finish.