Add a new resource view

Make sure to know clearly beforehand which items must be shown. You could make a drawing on paper first. Ensure that the resource view is also visible on the screen with the smallest resolution.
  1. Click the tab Resource View.
  2. Click Add Resource View .
  3. In the field Name enter the name of the resource view.
  4. Click Finish.
    The name of the resource view appears in the Data tab of the Name field.
  5. Enter a unique name in the Navigation ID field of the Data tab. This unique ID ensures that you can move from one resource view (navigate) to the next resource view.
  6. Check Use as Extended View if you want to use this resource view on a second screen.
    To link an extended resource view to a view on the main screen, set the same navigation ID for both views. If no view is linked according to ID, the first view in the list will be displayed.
    If Show Selector is checked at the Resource View Settings of the regarding touch device, a choice can be made between the extended resource views.
  7. Edit the visualization.