Set a calendar as default

  • You must choose a default calendar for the resources.
  1. Choose Resource Management > Calendars in the Navigation Pane.
  2. Choose the calendar to use as the default for the resources in the Data pane.
  3. Choose the vertical tab Production > sub tab Production Settings.
  4. Check the field Machines/Work Centers default in the option group Settings.
  5. Choose the calendar to use as the default for the work zones in the Data pane.
  6. Choose the vertical tab Warehouse > sub tab Warehouse Settings.
  7. Check the field Work zone default in the option group Settings.