View anomaly details

Anomalies are generated automatically if the configured rules are not met. Anomalies can also be added manually by the supervisor.

For example, if an employee is assigned to a requirement for which he lacks the necessary skill, an anomaly will be automatically assigned to that requirement.

You can view the anomaly details for an explanation of the anomaly and, if necessary, the rule that generated the anomaly.

  1. Choose Capacity Management > Planning Cells in the Navigation Pane.
  2. Select the planning cell.
  3. Choose the tab Planning in the Data Pane.
  4. Use a time filter to select the desired period.
  5. Select one or more requirements with an anomaly in the requirements pane or one or more availabilities with an anomaly in the availability pane.
  6. Choose the tab Anomalies in the requirements detail pane or in the availability detail pane.
  7. Select the anomaly in the detail pane.
  8. Do one of the following:
    • Click Anomaly Details in the vertical toolbar.
    • Right-click the selection and choose Anomaly Details in the shortcut menu.
  9. View the anomaly details in the dialog box Anomaly Details and click OK.