Copy an OEE target

The same OEE targets can be set for similar production processes (the same type of machines, for example). You can copy the targets from an existing production process to another production process. You can edit the targets of an existing production process for a new period.

  1. Choose Production Management > OEE Targets in the Navigation Pane.
  2. Select a production process with fixed OEE targets in the Data Pane.
  3. Do one of the following:
    • Click Copy OEE Target in the toolbar.
    • Right-click the selection and choose Copy OEE Target in the shortcut menu.
  4. Click Paste OEE Target in the toolbar.
  5. Where applicable, in the dialog box Wizard Paste OEE Target, complete the fields below:
    Option Group Field Explanation
    Process Resource Enter the name of the resource or click Resource Selection to select the resource.
    Operation Enter the name of the operation or click Select Operation or press ALT + O to select the operation.
    Item Group Enter the name of the item group or click Select Item Group .
    Item Enter the name of the item or click Select Item or press ALT + I to select an item.
    Period From The period for which the entered targets are references.
    Until
    Settings OEE The OEE target. See OEE figure.
    Availability The target for availability. See Availability (OEE2).
    Productivity The target for productivity. See Productivity (OEE3).
    Quality The target for quality. See Quality (OEE4).
    Capacity The target for capacity. See Capacity (OEE1).
  6. Click Finish.
    • At least 1 target should be entered.
    • Only 1 target can be assigned to a process (resource, operation, item) in the same period.