| Process |
Resource |
Enter the name of the resource or click Resource Selection
to select the resource. |
| Operation |
Enter the name of the operation or click Select Operation
or press ALT + O to select the operation. |
| Item Group |
Enter the name of the item group or click Select Item Group
. |
| Item |
Enter the name of the item or click Select Item
or press ALT + I to select an item. |
| Period |
From |
The period for which the entered targets are references. |
| Until |
| Target Values |
OEE |
The OEE target. See OEE figure. |
| Availability |
The target for availability. See Availability (OEE2). |
| Productivity |
The target for productivity. See Productivity (OEE3). |
| Quality |
The target for quality. See Quality (OEE4). |
| Capacity |
The target for capacity. See Capacity (OEE1). |