Calculate stock breaks of an operation

Module Warehouse Management Engine required.

  1. Choose Production Management in the Navigation Pane.
  2. Choose My Planning Cells, and select a planning cell in the Navigation Pane.
  3. Choose the tab Planning.
  4. Check if the toggle button View Stock Break Information is activated (see Show stock break information).
  5. Select the desired resource in the Gantt diagram.
  6. Go to the sub tab Planning.
  7. Do one of the following:
    • Select an operation in the table, and click Calculate Stock Break .
    • Right-click the operation in the diagram, and choose Calculacte Stock Break in the shortcut menu.
    A notification is displayed that the calculation might take several minutes. Click Yes to proceed.
    The warning symbol will be colored yellow for operations for which an actual stock break is calculated.
    Make sure this step is executed before proceeding to the next step. Operations accompanied by a gray warning symbol probably contain obsolete information concerning inventory anomalies.
  8. Go to the sub tab Planning, and move the cursor over the yellow warning symbol in column 5 of the desired operation. View the anticipated stock breaks.