Jump to main content
Objective logo
Objective user manual 7.x
  • Preface
  • Introduction
  • Applications
  • General
  • MES
  • WMS
  • WFM
Index
  1. Home
  2. MES
  3. Planning Management
  4. Production Calendars
  5. Supervision
  • MES
    • Production Management Engine
    • Process & Quality Management
    • Material Management
    • Advanced Equipment Management
    • Operator Activity Management
    • Advanced Data Collection
    • OEE
    • Planning Management
      • Planning Cells
      • Relations between operations
      • Planning Board
      • Planning
      • Production Calendars
        • Supervision
          • Edit the days of a chosen period
          • Edit the day regimes of the selected days
          • Edit the shifts for a chosen period
          • Edit the shifts of the selected days
      • Multi Level BOM
    • Advanced Planning
    • ISA88 Batch Management
    • One Piece Flow Line Balancing
    • Subcontracting
    • Product Tracking & Genealogy (MES)

Supervision

The production calendars can be viewed via the elements Departments, Machines, Work Centers, Resource Groups and Planning Cells. A Production calendar can only be edited via the element Planning Cells.

  • Edit the days of a chosen period
  • Edit the day regimes of the selected days
  • Edit the shifts for a chosen period
  • Edit the shifts of the selected days
  • Edit the days of a chosen period
  • Edit the day regimes of the selected days
  • Edit the shifts for a chosen period
  • Edit the shifts of the selected days